Causes of knocking failures in engines of fire engines

First, the fire engine ignition angle is too early In order to make the piston after the compression of the top dead center, once the power stroke can immediately get power, usually before the piston reaches the top dead center ignition (because from ignition to complete combustion takes some time) . However, too early ignition will cause most of the oil and gas to burn when the piston is still in the compression stroke. At this time, the unburned oil and gas will withstand extreme pressure auto-ignition and cause knocking.

Second, excessive carbon fire engine
If the excessive carbon deposition in the combustion chamber of the engine will increase the compression ratio (high pressure is generated), high-temperature hot spots will be generated on the carbon deposition surface and the engine will knock.


Third, the air-fuel ratio of fire engines is not correct
Too light a mixture ratio of fuel to air will increase the combustion temperature, and an increase in the combustion temperature will cause an increase in the temperature of the environmental protection sweeper engine, which is, of course, prone to knocking. IV. Fuel octane is too low
The octane number is an indicator of the anti-knocking of the fuel. The higher the octane number, the stronger the anti-knocking resistance. The high compression ratio of the Sanitation Sweeper engine, the combustion chamber pressure is high, if the use of low anti-knocking fuel, knocking is likely to occur.

Wind Power

Our firm introduced whole set of good-sized numerical control hydraulic folding equipment(1280/16000) as well as equipped with a series of good-sized professional equipments of armor plate-flatted machine, lengthways cut machine, numerical control cut machine, auto-closed up machine, auto-arc-weld machine, hydraulic redressing straight machine, etc. The firm produces all sorts of conical, pyramidal, cylindrical steel poles with production range of dia 50mm-2250mm, thickness 1mm-25mm, once taking shape 16000mm long, and large-scale steel components. The firm also is equipped with a multicolor-spayed pipelining. At the meantime, for better service to the clients, our firm founded a branch com. The Yixing Jinlei Lighting Installation Com, which offers clients a succession of service from design to manufacture and fixing.

Our products put into market range in: transmission line steel poles, substation tubular poles, high mast poles, flag poles, traffic signal poles, large advertising boards, street lamp poles, telecommunication poles, wind power poles, courtyard lamps,. The products has been sold to Southeast Asia, Australia, Middle East and Europe etc. as well as domestic most provinces and area, has been proved by the English Moody Co., comply with ISO9001:2000 Quality Control Certifications System standards. We have got the certificate for 220KV Transmission line steel poles, 500KV Steel construction and tubular poles, 750KV and below voltage Steel Tubular Tower and Telecommunication Poles.

Wind Power Pole, Wind Power Steel Pole, Solar Lighting Pole, Power Lighting Pole

Jiangsu Xinjinlei Steel Industry Co., Ltd. , https://www.jinleisteeltower.com