Operating Instructions | ||||||||
1. Clean and grease both the sealing face and sealing groove of unions and clean the inside of the line pipe. | ||||||||
2. Check whether all connecting positions are fastened. | ||||||||
Maintenance | ||||||||
1. Inject grease into the mud gate valve at specified intervals. | ||||||||
2. Check whether all connecting positions and fixing bolts are loose at specified intervals. | ||||||||
3. If the leakage around the sealing position occurs, the seal shall be replaced immediately. | ||||||||
4. Keep the outer surface of the manifold clean and do regular painting to prevent rust. | ||||||||
Note: | ||||||||
The Z23Y-5000PSI metal seated mud gate valve is only used as a shutoff valve and cann't be used as a choke valve, otherwise the sealing surface will be damaged. | ||||||||
GROUND CONTROL ASSEMBLY | ||||||||
During the cause of test, fluid should be controllably guided into separator and burner after flowing through drilling rod or tubing, the assembly is named as control assembly, which can control the pressure and flow-rate of the fluid safely and effectively. | ||||||||
1. Control Head | ||||||||
Jointed with the upper of the test string, control head is classified into rotary head and un-rotary head of two kinds, and also into three kinds of 35MPa, 70MPa and 105MPa according to the bearing pressure, and it can let the high-pressure fluid flow out of string, but also pump fluid into well. | ||||||||
2. Rigid manifold | ||||||||
Used to control fluid pressure and flow-rate, rigid manifold is jointed with control head upwards and connected with separator and blowout pipeline downwards. | ||||||||
The working pressure includes 35MPa, 70MPa and 105MPa with appropriate test pressure of 70MPa,105MPa and 140MPa. | ||||||||
3. Active manifold | ||||||||
Used to joint the control head, rigid manifold and blowout pipeline, the manifold consists of special EUE seamless steel pipeline union and active elbow. | ||||||||
The working pressure includes 35MPa, 70MPa and 105MPa with appropriate test pressure of 70MPa,105MPa and 140MPa. | ||||||||
The manifold should be regularly inspected and lubricated, sealing ring should be replaced and sealing tested to ensure safety in test. | ||||||||
Parts List: | ||||||||
Item | Component | Qty | Material | |||||
1 | Pressure Gauge | 1 | ||||||
2 | Needle Valve | 4 | ||||||
3 | Buffer | 1 | ||||||
4 | Tee | 1 | 4130 | |||||
5 | Elbow | 1 | 4130 | |||||
6 | Plug Valve | 1 | ||||||
7 | Tee | 1 | 4130 | |||||
8 | Check Valve | 4 |
Operating Instructions | ||||||||
1. Clean and grease both the sealing face and sealing groove of unions and clean the inside of the line pipe. | ||||||||
2. Check whether all connecting positions are fastened. | ||||||||
Maintenance | ||||||||
1. Inject grease into the mud gate valve at specified intervals. | ||||||||
2. Check whether all connecting positions and fixing bolts are loose at specified intervals. | ||||||||
3. If the leakage around the sealing position occurs, the seal shall be replaced immediately. | ||||||||
4. Keep the outer surface of the manifold clean and do regular painting to prevent rust. | ||||||||
Note: | ||||||||
The Z23Y-5000PSI metal seated mud gate valve is only used as a shutoff valve and cann't be used as a choke valve, otherwise the sealing surface will be damaged. | ||||||||
GROUND CONTROL ASSEMBLY | ||||||||
During the cause of test, fluid should be controllably guided into separator and burner after flowing through drilling rod or tubing, the assembly is named as control assembly, which can control the pressure and flow-rate of the fluid safely and effectively. | ||||||||
1. Control Head | ||||||||
Jointed with the upper of the test string, control head is classified into rotary head and un-rotary head of two kinds, and also into three kinds of 35MPa, 70MPa and 105MPa according to the bearing pressure, and it can let the high-pressure fluid flow out of string, but also pump fluid into well. | ||||||||
2. Rigid manifold | ||||||||
Used to control fluid pressure and flow-rate, rigid manifold is jointed with control head upwards and connected with separator and blowout pipeline downwards. | ||||||||
The working pressure includes 35MPa, 70MPa and 105MPa with appropriate test pressure of 70MPa,105MPa and 140MPa. | ||||||||
3. Active manifold | ||||||||
Used to joint the control head, rigid manifold and blowout pipeline, the manifold consists of special EUE seamless steel pipeline union and active elbow. | ||||||||
The working pressure includes 35MPa, 70MPa and 105MPa with appropriate test pressure of 70MPa,105MPa and 140MPa. | ||||||||
The manifold should be regularly inspected and lubricated, sealing ring should be replaced and sealing tested to ensure safety in test. | ||||||||
Parts List: | ||||||||
Item | Component | Qty | Material | |||||
1 | Pressure Gauge | 1 | ||||||
2 | Needle Valve | 4 | ||||||
3 | Buffer | 1 | ||||||
4 | Tee | 1 | 4130 | |||||
5 | Elbow | 1 | 4130 | |||||
6 | Plug Valve | 1 | ||||||
7 | Tee | 1 | 4130 | |||||
8 | Check Valve | 4 |
The air guns can made of plastics and Zinic alloy .They are usually used in cleaning the machines as a Air Duster, it can afford a very high pressure , even the higher pressure , the function will be better, for the Zinic alloy airguns , there can be placed a valve on the nozel to adjust the pressure .
Air Gun,Air Spray Gun,Air Soft Guns,Air Blow Gun
Cixi Youtian Pneumatic Component Co.,Ltd. , http://www.china-youtian.com